Two buffer storage tanks for biogas plant

Two buffer storage tanks for biogas plant: Logistical masterpiece through the Neckartal

In March 2019, SÜLZLE KOPF Anlagenbau delivered two large buffer storage tanks to the biogas plant of Osswald & Schrägle GbR. With a weight of almost 13 tons and a total length of over 15 m, the huge storage tanks could only be transported using heavy transport. Together with the escort, the column covered the almost twelve kilometres from the SÜLZLE KOPF production hall in Sulz-Bergfelden to Glatt in the shortest possible time and brought the vessels with a capacity of 152,000 litres safely to their destination. On site, the boilers were delivered to their new location in such a way that they could be installed without any problems.

Facts and figures about the project:

13 t

Weight of buffer storage tanks

over 15 m

Length of buffer storage tanks

Location of the reference project:

Manfred Oswald & Hans Peter Schrägle GbR
Keltenstraße
72172 Sulz am Neckar

Google Maps

By loading the map you accept the privacy policy of this website and Google
Privacy policy Google
Privacy policy of this website

Load map

To the references